Three Rivers Therapy has completed two new buildings on its behavioral health campus at 10467 and 10521 W. Clearwater Ave. in Kennewick that include an outpatient therapy office providing youth counseling services and a peer respite facility.
Three Rivers Therapy’s mission is to ensure equal access to equitable behavioral...
The city of Kennewick recently completed a new two-story fire station approximately 23,200 square feet in size that includes operations on the ground floor and fire administration offices on the second floor. The facility is at 302 W. 10th Ave.
The ground-level areas support crew functions with work spaces, living areas,...
Ford Group LLC has built a modern building designed with single slope roofs and floor-to-ceiling windows with 4,653 square feet of space at 1663 Fowler St., Richland.
It is built to grey shell condition with the intent of offering as vanilla shell once a tenant has been selected. The asking rate...
Quake – The Epicenter of Family Fun is a 40,000-square-foot, family entertainment center in Kennewick.
The park includes trampoline attractions, a ninja warrior course, tactical laser tag, toddler play area, golf simulator, large redemption arcade, laser maze cafe, bar, public and private party areas and more.
EleMar Oregon LLC: Tri-Cities completed construction on a new two-story building in Pasco that features office space, a lobby with countertop displays and an active warehouse for slab materials.
The 29,000-square-foot building at 1879 N. Commercial Ave. features standard tilt-up construction.